Browsing by Author Ramli, M.Z.
Showing results 32 to 36 of 36
< previous
Issue Date | Title | Author(s) |
---|---|---|
2019 | Relative importance index (RII) in ranking of quality factors on industrialised building system (IBS) projects in Malaysia | Azman, N.S. ; Ramli, M.Z. ; Razman, R. ; Zawawi, M.H. ; Ismail, I.N. ; Isa, M.R. |
2018 | A review of structural equation model for construction delay study | Ramli, M.Z. ; Malek, M.A. ; Muda, M.Z. ; Talib, Z.A. ; Azman, N.S. ; Fu'ad, N.F.S.M. ; Zawawi, M.H. ; Katman, H.Y. |
2018 | Study of factors influencing construction delays at rural area in Malaysia | Ramli, M.Z. ; Malek, M.A. ; Hanipah, M.H. ; Lin, C.L. ; Mahamad Sukri, M.F. ; Zawawi, M.H. ; Zainal Abidin, M.Z. ; Mohamad Fuad, N.F.S. |
2018 | The study of Phosphorus distribution at Putrajaya Wetland | Zahari, N.M. ; Abdul Malek, N.F.F. ; Fai, C.M. ; Haron, S.H. ; Zawawi, M.H. ; Ismail, I.N. ; Mohamad, D. ; Syamsir, A. ; Sidek, L.M. ; Ramli, M.Z. ; Ismail, N. ; Sapian, A.Z. ; Noordin, N. ; Rahaman, N.A. ; Muhamad, Y. ; Saman, J.M. |
2014 | The importance of lightweight concrete technology development for IBS industry in Malaysia based on cost comparison between concrete slab and hollow core slab: A case study of LRT car park project | Ramli, M.Z. ; Mahayudin, H.M. ; Hayder, G. ; Hafiz, Z.M. ; Daud, M. ; Salleh, A.M. |