Publications

Results 1-6 of 6 (Search time: 0.0 seconds).

Issue DateTitleAuthor(s)
12014Tunneling in limestone rock using TBM method for MRT projects near cochrane stationPauzi, N.I.M. ; Radhi, M.S.M. ; Wong, L.S. ; Omar, H. 
22014Settlement prediction of soil at closed dumping area using power creep function and simulated by monte Carlo simulation methodPauzi, N.I.M. ; Omar, H. ; Misran, H. ; Othman, S.Z. ; Manap, A. 
32010Settlement model of waste soil for dumping area in MalaysiaPauzi, N.I.M. ; Omar, H. ; Huat, B.K. ; Misran, H. 
42011Microcrack pattern propagations and Rock Quality Designation of Batu Caves LimestonePauzi, N.I.M. ; Omar, H. ; Huat, B.K. ; Misran, H. ; Yusoff, Z.M. 
52017Long-term settlement prediction at open dumping area using Hossein and Gabr method for new developmentPauzi, N.I.M. ; Shariffuddin, A.S. ; Omar, H. ; Misran, H. 
62014Characterizations of waste soil of open dumping areaPauzi, N.I.M. ; Omar, H. ; Huat, B.B.K. ; Misran, H. 

Loading... 2 0 5 0 false
Full Name
Omar, H.
Loading... 3 0 5 0 false